Streets

Road Projects

Starting Friday 11/15, Atmos’ contractors will begin boring under Cleveland-Gibbs Rd. and FM 407 for a gas line installation. Atmos’ contractor will be installing the lines 24 hours per day from Friday through Tuesday. Excavating and boring will occur during daylight hours roughly 7 am to 7 pm. Pressure testing will occur overnight. 

73515642_2835600583137961_563834463281217536_o

Roads Maintained by the Town of Northlake

To report a problem with a road, such as a pothole, fill out this form. In case of an emergency, call 9-1-1. 

TxDOT Maintained Roads

The Town does not maintain the following roads. To report a problem, fill out the form here on the TxDOT website or call the Denton county office at 940-387-1324. In case of an emergency, contact 9-1-1. To check road construction projects by TxDOT, you can use the Project Tracker on the TxDOT website. 

  • FM 156
  • FM 407
  • FM 1171
  • IH 35
  • IH 114

Harvest Subdivision

The Town does not maintain the roads in the Harvest subdivision. To report a problem, here is a list of important number for the Homeowner's Association (HOA).